Battery Energy Storage (BESS) Advisory

Oztoprak Energy provides independent BESS advisory covering feasibility studies, optimum MW/MWh capacity sizing, battery integration with HEPP and solar plants, revenue optimization, and technical due diligence — for investors and plant owners evaluating storage additions to existing generation assets in Turkey.

Technical Scope

BESS Feasibility and Optimum Capacity Sizing

Technical and economic feasibility assessment before a battery investment decision. Sizing considers MW (power) and MWh (energy capacity) together, aiming for the capacity range that best supports investment returns rather than the largest possible battery.

BESS Technical Due Diligence

Pre-investment review of battery storage projects — cell chemistry selection, degradation modelling, PCS efficiency, BMS capability, fire protection, and site integration risk.

Grid Compliance Review

Assessment of BESS grid connection requirements under TEİAŞ rules — FRT capability, protection coordination, reactive power mode, black start readiness, and frequency response.

EPC Scope and Performance Guarantee Review

Independent review of BESS EPC contracts — RTE efficiency guarantees, degradation allowance, availability warranties, FAT/SAT procedures, and commissioning test criteria.

BESS from an Investment Perspective

A battery energy storage system (BESS) stores electricity and releases it later, which can change how a generation asset earns revenue and manages grid constraints. Whether that is worthwhile depends on the specific plant, its connection, its production profile and the market conditions it operates in. For an investor the useful question is therefore not whether to install a battery, but under which technical and economic assumptions a given size makes sense, and what must be verified before committing capital.

Our Engineering Evaluation Framework

Each BESS engagement is built around the topics below. They describe what is reviewed, not typical results: capacities, efficiencies, costs and returns are determined project by project from the plant's own data and current supplier documentation.

Power-to-energy ratio and storage duration

MW and MWh are sized together. Storage duration (hours at rated power) is a design variable derived from the plant's production profile, grid limits and the intended use of the battery, not a fixed value.

PCS selection

Power rating, reactive power capability, grid-code compliance, efficiency across the operating range, thermal derating, and AC- versus DC-coupling for the specific plant.

Battery container configuration

DC block sizing, cooling and thermal management, fire protection, layout and access, and conformity with the applicable standards and permitting requirements.

Transformer and grid connection

Connection point and voltage level, transformer sizing, protection coordination and the effect of the battery on fault levels at the point of connection.

Short-circuit and grid constraints

Short-circuit contribution, fault ride-through behaviour, export and import limits and the operator's technical requirements, checked before capacity is fixed.

Degradation and augmentation

Capacity fade assumptions taken from supplier data and tested against the planned cycling regime, with an augmentation or replacement strategy reflected in the model.

Round-trip efficiency and availability

Efficiency is only comparable when the measurement boundary is defined (for example at the point of connection, including auxiliaries). Availability definitions and exclusions are reviewed in the contract.

CAPEX and OPEX assessment

Cost items (battery, PCS, balance of plant, EPC, grid connection, O&M, augmentation, insurance) are compared on a like-for-like basis using current quotations, never generic benchmarks.

Technical specification and bid evaluation

Specification drafting and technical comparison of EPC and vendor offers: scope gaps, interfaces, performance guarantees, test procedures (FAT/SAT), warranty exclusions and liability terms.

Optimum MWh Sizing Approach

A plant's historical production data and market price data can be analyzed to compare different BESS capacity scenarios — for example, illustrative candidates such as 5 MWh, 10 MWh, 15 MWh or 20 MWh. This is not a fixed methodology or a mandatory step size applied to every project; the optimization resolution can vary depending on the project's characteristics, data availability, and objectives. The goal is not to select the largest possible battery, but to identify the BESS size that best supports investment returns.

MW ≠ MWh

MW describes power — how fast the battery can charge or discharge. MWh describes energy capacity — how much energy it can store. A sound BESS sizing exercise treats these as two separate, jointly optimized parameters, alongside efficiency, degradation, SoC/DoD limits, and cycle life.

HEPP + BESS Integration

For hydropower plants, BESS integration is evaluated against the plant's own production variability and the value of shifting output to higher-price hours, within the plant's operating and connection constraints.

HEPP production profile and hydrological variability

Hourly production vs. market price alignment

Charging in low-price hours, discharging in higher-value hours

Plant operating constraints and connection capacity limits

Turbine/generator operating characteristics alongside BESS response

BESS power-to-energy (MW/MWh) ratio optimization

Cycle optimization and degradation impact on long-term revenue

Solar + BESS Integration

For solar plants, BESS is typically evaluated in relation to the production curve, curtailment exposure, and the opportunity to shift solar output into higher-value hours.

Solar production curve and peak-shifting potential

Curtailment assessment and energy-shifting opportunity

Connection capacity and co-location constraints

BESS sizing relative to installed solar capacity

Charge/discharge strategy optimization

Investment return analysis for the combined GES+BESS asset

HEPP+BESS is one of our main commercial priorities, but BESS advisory is not limited to hydropower — solar and other generation assets are evaluated on the same basis.

BESS Revenue Optimization

Equipment cost alone is not a sufficient basis for a BESS investment decision. Where suitable, the evaluation model can be described as follows:

Production data + market price dataBattery technical parameters (efficiency, DoD, cycle life)CAPEX / OPEX and degradation assumptions→ Optimization→ MW / MWh scenarios→ Annual revenue / cash flow estimate→ Investment return indicators

This process does not produce a guaranteed revenue figure or a guaranteed return rate. It compares scenarios so that a capacity decision can be made on an informed basis.

Project-Specific Analysis and Optimization Approach

Proje özelinde geliştirilen analiz ve optimizasyon modelleri ile farklı BESS güç ve enerji kapasitesi senaryoları karşılaştırılabilir. This is a project-specific advisory approach, not a ready-made commercial software product.

Model inputs

Production time series

Electricity price time series

MW and MWh candidates

Round-trip efficiency

SoC limits and DoD

Cycle constraints and degradation

CAPEX and OPEX

Outputs

Suitable capacity scenarios

Estimated energy-shifting volume

Indicative revenue impact

Cycling behavior

Battery utilization rate

Investment return indicators

BESS Pre-Feasibility Study

Potential scope — the actual scope of an engagement is shaped by the project's specific needs, not applied identically to every project:

  1. 1

    Data collection

  2. 2

    Production profile analysis

  3. 3

    Market price analysis

  4. 4

    Identification of technical constraints

  5. 5

    MW / MWh scenarios

  6. 6

    Charge/discharge simulation

  7. 7

    Degradation impact

  8. 8

    Revenue analysis

  9. 9

    CAPEX / OPEX assessment

  10. 10

    Financial scenario analysis

  11. 11

    Recommended BESS capacity range

  12. 12

    Technical and economic summary report

Technical topics we cover

Lithium-ion chemistry selection: LFP vs NMC for utility-scale storage

BESS degradation modelling and capacity warranty evaluation

Power Conversion System (PCS) grid interface and harmonic compliance

Battery Management System (BMS) protection and communication protocols

TEİAŞ grid code compliance for large BESS facilities

BESS co-location with solar — control strategy and grid connection impact

Fire suppression system adequacy and IEC 62933 compliance

Revenue stacking strategies: frequency regulation, arbitrage, capacity

BESS lender's engineer scope for project finance

Operational KPI framework and O&M contract adequacy

Related services

Market context — Turkey BESS

Turkey's BESS market is being shaped by YEKA storage tenders, ancillary service market reforms, and co-location requirements for large renewable plants. TEİAŞ grid code requirements for battery storage are still developing — projects procured today will need to meet evolving compliance obligations through their operating life.

A BESS addition's potential effect on a plant's revenue profile and economic value can be assessed on a scenario basis, project by project — this is not a guaranteed increase in plant value.

Ready to identify what is limiting your plant's performance?

Request a focused consultation for project feasibility, commissioning risk, O&M performance, grid protection, or acquisition due diligence.