Most DownloadedTechnical Due Diligence Checklist
A 47-point checklist for solar and hydropower technical due diligence. Covers EPC documentation, commissioning evidence, performance records, grid compliance, O&M quality, and red flag indicators. Used by investment teams and lender engineers on Turkish renewable energy transactions.
Reactive Power Penalty Analysis Template
Excel template for calculating your current TEİAŞ reactive power penalty exposure. Input 12 months of invoice data. Outputs: monthly penalty breakdown, annual total, power factor trend, and estimated payback period on a compensation upgrade.
Owner's Engineering Scope Checklist
What should an Owner's Engineer actually do on a renewable energy project? This checklist covers pre-construction review, construction-phase inspection hold points, commissioning witness tests, and handover document requirements. Use it to evaluate your current OE scope or benchmark a potential engagement.
Grid Compliance Audit Checklist
A structured checklist covering the most common TEİAŞ grid compliance gaps in operating solar and hydropower plants: protection relay settings, reactive power capability, FRT performance, SCADA telemetry accuracy, and documentation completeness.
FAT & SAT Inspection Checklist
Two-part acceptance test checklist aligned with IEC 62446-1 requirements. Part 1 covers Factory Acceptance Test items for inverters and transformers. Part 2 covers Site Acceptance Test scope for solar plant DC/AC commissioning including string testing, protection relay verification, and SCADA commissioning.
EPC Tender Technical Review Guide
A practical guide to reviewing EPC tender submissions from a technical risk perspective. Covers scope gap identification, interface risk assessment, performance guarantee enforceability, liquidated damages adequacy, and contractor qualification review. Intended for developer and owner teams evaluating multiple EPC bids.
Custom Technical Assessment
Need a checklist tailored to your project?
These checklists cover the most common scenarios. Complex transactions — multi-asset portfolios, HEPP relicensing, EPC disputes — often require a custom scope. Contact us to discuss what's right for your situation.
Request Custom Assessment