Oztoprak Energy Consultancy Logo
ÖZTOPRAK
ENERGY CONSULTING

Industrial Energy Cost Advisory

Free Industrial Electricity Bill Review

Send us your last 12 months of electricity bills. We will identify reactive power penalty exposure, contract demand risks, tariff optimization opportunities and rooftop solar feasibility — at no cost.

28+

years power sector experience

16%

average bill reduction — industrial case study

5–7

working days for preliminary review

Common Industrial Electricity Cost Problems

Reactive Power Penalties

Many factories pay 10–25% extra on their electricity bill due to reactive power penalties caused by an undersized or poorly maintained compensation panel. These penalties are largely preventable.

Contract Demand Misalignment

Contract power (sözleşme gücü) set too high creates fixed capacity charges every month. Set too low, it triggers excess demand penalties. A 12-month bill analysis typically reveals 5–10% of recoverable capacity cost.

Tariff Structure Risk

Industrial facilities above TEDAŞ consumption thresholds may qualify for open market electricity contracts at lower rates. Remaining on regulated tariffs can mean paying 15–30% more than necessary.

Rooftop Solar Potential

A facility with >500 m² of suitable roof area and consumption above 200,000 kWh/year typically achieves 5–7 year payback on a rooftop solar installation with 60–80% self-consumption rate.

How the Free Review Works

01

Submit Your Request

Complete the form below. Providing your monthly bill range and primary concern helps us direct your request to the right specialist immediately.

02

We Request Your Bills

We will contact you within 1–2 business days. You send us your last 12 months of electricity bills (PDF or photograph is fine). No sensitive financial data required.

03

Preliminary Bill Analysis

We analyze reactive penalty patterns, contract demand utilization, consumption trends and tariff category. This takes 3–5 working days.

04

Review Memo Delivered

You receive a short written memo identifying the main cost drivers, estimated annual saving potential and recommended next steps — at no charge.

What the Free Review Covers

  • Reactive power penalty ratio and annual penalty cost estimate
  • Contract demand utilization pattern (last 12 months)
  • Excess demand charge incidents and avoidable cost
  • Tariff category check and open market threshold assessment
  • Rooftop solar eligibility indicator based on consumption profile
  • Written preliminary memo with savings potential estimate

Request Your Free Electricity Bill Review

We respond within 1–2 business days.

Your information is kept strictly confidential and used only to prepare your preliminary review.

Frequently Asked Questions

Is the bill review genuinely free?

Yes. The preliminary review is provided at no charge. If you wish to proceed to a detailed paid audit, we will outline the scope and cost at that stage. There is no obligation.

What documents do I need to provide?

Your last 12 months of electricity invoices is the minimum required. If you have reactive power measurement data, compensation panel specifications or contract documents, those help but are not mandatory.

Can you work with facilities outside major cities?

Yes. The preliminary review is conducted remotely based on your billing documents. On-site visits can be arranged for facilities in any Turkish province for a detailed paid engagement.

How confidential is my facility's data?

All facility and billing information is treated as strictly confidential. It is used only to prepare your review and is not shared with any third party.

What if my facility already has a compensation panel?

Having a panel does not mean it is sized or operating correctly. Many facilities with existing compensation panels still pay significant reactive penalties due to inadequate sizing, harmonic issues or control system faults. The review checks the penalty pattern regardless.